The New Swan River Bridge is Open

The new Swan River Bridge on Rt. 28 opened to all vehicle traffic late yesterday, Monday, April 14, 2014.  Work will begin to dismantle the temporary bridge over the next 4-6 weeks. Everything should be back to normal by mid June.IMG_4039 IMG_4040 IMG_4041 IMG_4042

This entry was posted in Uncategorized. Bookmark the permalink. Follow any comments here with the RSS feed for this post. Both comments and trackbacks are currently closed.

Comments are closed.